Saturday, 10 July 2010

Floor



 

 
Started the floor today, firstly by sticking 6mm ply down to the bare floor, then sticking battens down then insulation in between followed by 12mm ply on top creating a sandwich type floor.


The task was much harder and time consuming than first thought but all seemed to come together in the end. I used pu adhesive to stick it all down including a few blobs to secure insulation. I also made a channel in the form of a h shape to take any piping etc.

No comments:

Post a Comment